All public deliverables are listed in the table below.
M1 is September 2016
Work Package 2: Use-Case Driven Requirements Engineering and Architecture | Due date | Status | |
---|---|---|---|
D2.1 Industrial Use Cases for an Integrated Information Management System D2.2 Initial Requirements Specification D2.3 The COMPOSITION Architecture Specification I D2.4 The COMPOSITION Architecture Specification II D2.5 Lessons Learned and Updated Requirements Report I D2.6 Lessons Learned and Updated Requirements Report II |
M06 M06 M10 M24 M15 M28 |
Download Download Download Download Download Download |
|
Work Package 3: Manufacturing Modelling and Simulation | |||
D3.1 Process Modelling Representation and Monitoring Framework D3.2 Digital Factory Model I D3.3 Digital Factory Model II D3.4 Computational Modelling, Simulation and Prediction of Production I D3.5 Computational Modelling, Simulation and Prediction of Production II D3.6 Computational Modelling, Simulation and Prediction of Logistics I D3.7 Computational Modelling, Simulation and Prediction of Logistics II D3.8 Manufacturing Decision Support System I D3.9 Manufacturing Decision Support System II |
M18 M15 M26 M18 M28 M18 M28 M20 M30 |
Download Download Download Download Download Download Download Download Download |
|
Work Package 4: Secure Data Management and Exchange in Manufacturing | |||
D4.1 Design of the Security Framework I D4.2 Design of the Security Framework II D4.3 The COMPOSITION Blockchain D4.4 Prototype of the Security Framework I D4.5 Prototype of the Security Framework II D4.6 Viability of WSN as ICT Overlay for Physical Security Detection D4.7 Development and Installation of a WSN Physical Security System |
M12 M18 M30 M20 M30 M08 M28 |
Download Download Download Download Download Download Download |
|
Work Package 5: Key Enabling Technologies for Intra- and Interfactory Interoperability | |||
D5.1 Big Data Mining and Analytics Tools I D5.2 Big Data Mining and Analytics Tools II D5.3 Continuous Deep Learning Toolkit for Real Time Adaptation I D5.4 Continuous Deep Learning Toolkit for Real Time Adaptation II D5.5 Human-Machine-Interfaces for Direct Interaction with the Factory I D5.6 Human-Machine-Interfaces for Direct Interaction with the Factory II D5.7 Interoperability for M2M & HMI in Factory Environments I D5.8 Interoperability for M2M & HMI in Factory Environments II D5.9 Intrafactory Interoperability Layer I D5.10 Intrafactory Interoperability Layer II |
M15 M29 M16 M30 M13 M27 M08 M26 M18 M34 |
Download Download Download Download Download Download Download Download Download Download |
|
Work Package 6: COMPOSITION Collaborative Ecosystem | |||
D6.1 Real-Time Event Broker I D6.2 Real-Time Event Broker II D6.3 COMPOSITION Marketplace I D6.4 COMPOSITION Marketplace II D6.5 Connectors for Inter-Factory Interoperability and Logistics I D6.6 Connectors for Inter-Factory Interoperability and Logistics II D6.7 Collaborative Manufacturing Services Ontology and Language I D6.8 Collaborative Manufacturing Services Ontology and Language II D6.9 COMPOSITION Brokering and Matchmaking Components I D6.10 COMPOSITION Brokering and Matchmaking Components II |
M14 M26 M20 M34 M18 M34 M14 M30 M20 M34 |
Download Download Download Download Download Download Download Download Download Download |
|
Work Package 7: Integration of Internal and External Elements | |||
D7.1 Survey of Successful Elements with Recommendations for COMPOSITION Use Cases I D7.2 Survey of Successful Elements with Recommendations for COMPOSITION Use Cases II D7.3 Survey of Successful Elements with Recommendations for COMPOSITION Use Cases III D7.4 Test, Installation and Operation Plan Template I D7.5 Test, Installation and Operation Plan Template II D7.6 On-Site Readiness Assessment of Use Cases Based on Existing Sensor Infrastructure I D7.7 On-Site Readiness Assessment of Use Cases Based on Existing Sensor Infrastructure II D7.8 Lab Scale Use Case Deployment with Lessons Learned I D7.9 Lab Scale Use Case Deployment with Lessons Learned II D7.10 Integrated Business Model Decision System |
M12 M24 M36 M10 M22 M15 M29 M14 M27 M36 |
Download Download Download Download Download Download Download Download Download Download | |
Work Package 8: Industrial Pilots and Evaluation | |||
D8.1 Pilot Plans on the Shopfloors and Preparation Actions I D8.2 Pilot Plans on the Shopfloors and Preparation Actions II D8.3 Supply Chain Pilot I D8.4 Supply Chain Pilot II D8.5 Value Chain Pilot I D8.6 Value Chain Pilot II D8.7 Evaluation Framework D8.8 Final Evaluation Report of the COMPOSITION IIMS Platform |
M17 M30 M24 M36 M24 M36 M16 M36 |
Download Download Download Download Download Download Download Download |
|
Work Package 9: Business Models, Dissemination and Exploitation | |||
D9.1 Communication Strategy and Plan D9.2 Project Website D9.3 Dissemination Strategy and Plan D9.4 Project Advertising Material I D9.5 Project Advertising Material II D9.6 Project Advertising Material III D9.7 Cost, Benefit, and Risk Evaluation D9.8 Market Segmentation and Potential of COMPOSITION in European Industry D9.9 Sustainable Business Models for IIMS in Manufacturing Industries |
M02 M01 M03 M04 M14 M26 M25 M12 M24 |
Download Download Download Download Download Download Download Download Download |